Skip to content
WEKA
Energy

Run Energy Simulations at the Speed of the Decision

WEKA NeuralMesh removes storage constraints for petabyte-sized datasets across oil, gas, nuclear, fusion, & renewables.

Energy and Research Computing Deployments Worldwide

  • UK Atomic Energy Authority
  • Vera C. Rubin Observatory
  • TRE ALTAMIRA

USE CASES

Every energy simulation hits the same wall: sustained parallel I/O that legacy NAS and Lustre can't hold under AI-era metadata loads. WEKA® NeuralMesh™ delivers it from one namespace, on premises, in the cloud, or at a field site.

Oil and Gas Subsurface Intelligence

Oil and Gas Subsurface Intelligence

Full Waveform Inversion, reverse time migration, & reservoir simulation need fast parallel I/O for PB datasets. NeuralMesh cuts analysis from weeks to hours for faster extraction.

Grid Operations

Grid Operations

Interconnection studies take two to three years and gate every construction approval. Simulation on NeuralMesh compresses that timeline and shortens the path to revenue.

Nuclear and Fusion

Nuclear and Fusion

Coupled neutronics and plasma models run continuously across thousands of cores. One storage failure restarts everything, so NeuralMesh holds checkpoints through hardware faults.

Power Generation

Power Generation

Digital twins reach terabytes per asset, and carbon reporting needs live ingest alongside instant recall of multi-year archives. NeuralMesh serves both from one namespace.

Renewables

Renewables

Wind and solar forecast accuracy moves grid stability and trading margins. GPU-optimized storage keeps predictive maintenance models fed, so turbines and arrays stay online.

What Changes When Storage Stops Stalling

Measured across energy HPC deployments moving from legacy parallel file systems to NeuralMesh.

  • 0x

    Faster seismic processing vs. cloud

    A major oil and gas operator moved seismic workloads off its previous cloud architecture and held capacity spend flat through workload growth.

  • >0%

    Cut in grid study timelines

    Interconnection studies that ran two to three years gate construction approval, land acquisition, and revenue.

  • >0%

    GPU utilization, up from about 30%

    Same seismic throughput on a third of the infrastructure, or three times the capacity on the GPUs you already own.

WHY WEKA

Get Answers While They Still Change the Decision

Energy HPC is migrating to AI-optimized architectures, and Lustre and GPFS were not built for the metadata loads that come with it. Cloud-managed versions inherit the same limits.

A brightly lit industrial plant at night, with a complex structure of pipes and platforms, and two tall smokestacks against a dark sky.
  • Compress Seismic Runtimes From Weeks to Hours

    Deliver 6x the throughput of cloud-hosted Lustre to cut simulation runtimes from weeks to hours and move faster on every extraction decision.

1 / 6

UK Atomic Energy Authority
UK Atomic Energy Authority
Dr. Rob AkersDirector for Computing Programmes • UK Atomic Energy Authority

Never Starve Your Engineering Pipelines

Feed massive telemetry streams and simulations in real time. NeuralMesh eliminates data starvation so your GPU clusters never stall.

Watch Product Tour

Frequently Asked Questions

Did this page meet your expectations?